Silva Cells Part of the Massive Six Points Interchange Retrofit in Toronto – Case Study
– Silva Cells helped Toronto to meet its Green Standard Goals, managing 55% of the stormwater catchment area in a 6.47-hectare site. – Over 300 trees were planted, each with an average of 30m3 of soil. – Significant pollutants removed: 46% annual runoff removed, 74% total phosphorus removed, 83% annual (TSS) total suspended solids removed, and… More