In 2011, The Civic Centre in the heart of Mississauga added 1,010 1X and 2X DeepRoot Silva Cells to support the health and vitality of 30 trees. The trees are uniquely positioned on roof challenges and H-20 pavement requirements. Silva Cell met these challenges while also enhancing soil volumes for the trees.

Installation Summary:
Number of DeepRoot Silva Cells: 1010 (1X and 2X) on top of the Insulation foam
Amount of soil volume per tree: 17.8 m3 (631.25 ft3)
Number of trees and type: 30
Type of project: Integrated trees, stormwater
Project designer: Janet Rosenberg & Studio
Project contractor: Pave-Al Limited
Installation date of DeepRoot Silva Cells: November 2011
Project timeline: 2010–2012

Challenge | Solution

Because the Civic Square was located on top of a parking garage, a soil delivery system was needed that would be capable of providing a sufficient volume of soil to guarantee a long life for the trees and that could also support the weight of the pavement and the increased pedestrian traffic on the site from daily use as well as special events. The designers, Janet Rosenberg & Studio, selected the DeepRoot Silva Cell for this challenging project. JRS has partnered with DeepRoot on 25+ other projects across Canada.

The roof deck was retrofitted to support the added loads of the soil, trees, and Silva Cell system, and, as with most on-structure applications of Silva Cells, a drainboard was used to provide drainage at the roof deck level. High-density foam was also laid on top of the concrete roof of the parking garage to act as a lightweight fill to bring up the grade difference between the existing roof and the plaza elevations and was installed in variable thicknesses based on the contour of the existing space. Unlike conventional installations, stakes were not needed to affix the frames to the foam. In some areas, a concrete cap was poured over the top of the foam, and screws and washers were used to attach the frames to the subgrade concrete. In other areas, wood spacers were used between the frames to fix  them in place.

In total, 1,010 1X  and 2X Silva Cells were installed across the plaza square on top of the parking garage. Because the design criteria specified pedestrian-only, the pavement section over the Silva Cells was able to be reduced from what is normally required to meet H-20 standards and a thinner pavement was used.

Planning for the redesign of the Civic Square began in 2009 and was guided by the council’s desire to create a multifunctional, flexible, hard-surface civic space scaled for daily life as well as special events. The $40 million project evolved to become the city’s largest public infrastructure stimulus project, with costs split equally among the city, provincial, and federal governments. The first major step for the design was to bring the two squares to nearly the same grade, thus enabling a unified square to be formed via the temporary closure of Civic Centre Drive for large events. For the raised gardens on the Civic Square specifically, the objective of the design was to knit together the landscaped qualities of the intimate Jubilee Gardens, an English walled garden that was dedicated by the Duke and Duchess of York in 1987, into the Civic Square. The introduction of raised gardens to the Civic Square would create a strong green edge for a friendlier Civic Square and serve as a more open and public passageway into the Jubilee Gardens.

The 30 Autumn Blaze maples that were planted on the square have since seen  dramatic growth, creating a majestic tree canopy that serves to knit together the Civic Square and the adjacent Jubilee Gardens, creating a space more welcoming to both every day and celebratory use by residents and visitors.

Since the project’s completion, the plaza has been named Celebration Square. It is a welcoming space that the mayor of Mississauga, Hazel McCallion, reflected on just a few years after installation: “Every city has a heart, and this is ours.”

Celebration Square continues to benefit residents and visitors with art exhibitions, farmers’ markets, and a seasonal ice rink. It is the site of the annual Canada Day celebration for the city, and this year features a popup dance studio.

 

Have a product question or want to talk about a specific project?
Use the form to get in touch.

Contact Us Form


Interested in a DeepRoot product? Get a quote today.

Request a Quote [email protected]

Tel: 415 781 9700
Toll Free: 800 458 7668
Toll Free: 800 277 7668
Fax: 415 781 0191


Sign up to our newsletter to stay up-to-date on news, updates, and product information.