Quotes

Olympic Green Retaining Wall Installation Almost Complete

We just got some new pictures of the Silva Cell installation at the Olympic Green Retaining Wall in Stratford, UK, from installing contractor Carey Group. Other than the typically gray skies, the site looks great!

This is a picture of the site from the ground. Hedera Helix will grow out of the soil opening and up the 9m wall on the left to help beautify this stretch of sound barrier adjacent to the railroad tracks.

This is the site from above. You can tell in this photo just how bloody big a wall this is! (I don’t normally use the word “bloody” as an expletive, but since this is a UK project I figured it was appropriate).

We can’t wait to see the wall after the vines have been planted (not til 2012, sadly)!

2 comments

  1. Jeff

    How large was the gap (plant bed for the hedra helix) between the pavement and the wall in the Olympic Green Retaining Wall Installation?

    • Leda Marritz

      The gap is 360mm from the retaining wall to the first cell

Leave Your Comment

Join Our Newsletter

Sign up to our newsletter to stay up-to-date on news, updates, and product information.

Explore our archives

Interested in a DeepRoot product? Get a quote today.

Request a Quote [email protected]

Tel: 415 781 9700
Toll Free: 800 458 7668
Toll Free: 800 277 7668
Fax: 415 781 0191


Sign up to our newsletter to stay up-to-date on news, updates, and product information.